PROJECT DETAIL

Project Name: 1915 Canakkale Bridge, European Anchorage Structure

Client

 : 

Daelim-SK E&C – Limak- Yapı Merkezi JV

Location

 : 

Çanakkale

Scope Of Work

 : 

Turnkey

Date

 : 

2018-2019

Scope

 : 

66.000 m3 Concrete – 7.000 tons of Re-bar – Steel Construction and Prefabricated Elements

PHOTOS FROM THE PROJECT

European Anchorage Structure of the 1915 Çanakkale Bridge Project has been completed by TekyolPlus. Within the scope of the project, in addition to reinforced concrete works, prefabricated element fabrication&placement as well as ducts and steel construction works for anchor wires were also completed.